Equipment Settings

Click image for close up view
 

PICTURE 8-1
Installation of automotive seat cushion line. Exhaust system. Structural steel. Platforms and safety rails. Conveyor system.



 

PICTURE 8-2
Installation of Robot process line.



 

PICTURE 8-3
600 ton Pacific press. Turnkey installation. Complete foundation work. Set 36,000 lb. side frames, two required. Set 19,000 lb. ram. Set 21,000 lb. bed. Set 5,500 lb. hydraulic motors and reserve tank. Total weight 117,500 lb.




PICTURE 8-4
Urethane foam distribution robot. Equipment supplied by Linden EMB.



 

PICTURE 8-5
Dual Post Rinse including E-coat pump well, bag filters, ultra filters, heat exchanger, post rinse housing, pumps, tanks and flash tunnels. Installed during a 10-day shutdown.



 

PICTURE 8-6





PICTURE 8-7




 

PICTURE 8-8




 

PICTURE 8-9